Customization: | Available |
---|---|
After-sales Service: | Overseas Installing Service |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
General Description
Due to the low temperature filling (4 degree), while the normal temperature is higher than in such an environment, the water in the air is easily condensed in the outer surface of the bottle, which causes inconvenience to the labeling and wrapping.
Bottle warming machine is tunnel-type spray equipment, spray water through the circulation of heat exchanger, divided to three temperature zones (which can also design more zones), to be increased to room temperature(30-35degree).
Certification
Main Features
1) The machine is divided into running chains, frame, and pipeline for water circulation, steam pipeline and electric control.
2) Working principle
3) The inverter puts needle reducer and drives initiative square axles rotate through roller chain. The sprocket on the square axle drives the chain board of plastic to be moved, form the board organization of the chain. The in-feed bottle comes into the hot water area, and is arranged orderly, warming the bottle by hot water heated by steam.
4) Section I is the rising temperature by hot water, the temperature controlling precision is ±2°C. When the water comes to regulated level, the water flows out of overfall. Section II is the permanent temperature of hot water. The hot water feeds into the launching trough, while the level of troughs is lower than the liquid level, the water circulation is supplied water supply. When the water comes to regulated level, the water flows out of the overfall.
5) Section III is the spraying device of pure water, in order to keep the anhydrous mark of appearance after the cooled bottle dry.
6) Under the automatic condition , all of pumps run automatically ,protected by low liquid level .low liquid level can postpone a certain second(it is can designed in local).
7) No matter what it is manually or automatically controlling, the steam metering needle would work, under the condition of Trough No.1 and No.2 start-up; it shuts off up to the designed temperature ,and the steam metering needle turns off ;it turns on ,while it is lower than the designed temperature.
Our service
Installation and commissioning
After the equipments arrived buyer's workshop, the buyer should take it's place for each equipment according to the supplied layout; the seller will send the experienced technician to guide the installation and debugging and trail production, and fulfil the designed capability within the designed time. The installation, debugging and training is about 30-35 days.
Training
The seller will supply technical training to the buyer. The training is includes: equipment structure and maintenance, control and operation. After training, the technicians of the buyer will grasp relevant operation and maintenance skills, and could adjust the technologies more skilled, and can deal with all kinds of malfunction in time.
After-sales service
1) After qualified of the equipment, the seller will supply one year guarantee, control system one year guarantee, free charge for wearing parts, and other spare parts with cost price. Within guarantee period, the technicians who accepted training should strictly obey the requirements asked by the seller to operate the equipments and maintenance, to find the common malfunctions and fault clearing in time; if the technicians of the buyer couldn't solve the problems themselves, the after-sales department will supply long range guide service by phone; if relevant measurements couldn't solve the problems, the seller will send the technicians to the buyer factory, clear the fault or relevant technical problems on site, the charges will reference to the installation and debugging charges.
2) After guaranteed, the seller will supply widely favorable technical support, after-sales service for the lifetime: favorable price for the wearing parts and other spare parts.
(3)<1> Standardized workshop of total 30,000 square
<2> With a more than 30 professionals team to design and develop, is a key professional enterprise, which integrates development, research, design, manufacture, technology service and marketing.
<3> HY-Filling follows ISO9001:2000, CE Certificate , SGS , COC , TUV international quality management system.
<4>The equipment will be tested and run for 24 hours before leaving the factory, to ensure the smooth working of water pipeline, and pneumatic, electrical and mechnical stability.
<5>Professional installation team who are seasoned technician, Provide equipment quality installation services.