Customization: | Available |
---|---|
After-sales Service: | Supported |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Rinsing part The Rinsing machine connect with empty bottle conveyor frame, when empty bottle input rinsing machine extent, through photoelectrical reaction, Circuit control system command Pneumatic electromagnetic valve movements, let the Clip bottles of cylinder clip the bottle, then the cylinder operate, the bottleneck turn down, then the pure water pump open, spurt pure water to the bottle, after 30s, stop it, the cylinders reset, input the conveyor system and go to filling machine. |
|
Filling Part After-wash empty bottle input the filling machine through conveyor system, two push-barrel cylinders operate beside conveyor, then the bottle arrive filling part, the bottle bottom separate the conveyor belt. After filling, the bottle drop on the conveyor belt. Output to the capping part. |
|
Capping Part The screw capping machine is made of screw capping heads frame, after the filled bottle convey to the screw capping machine station, through air cylinder start to screw cap, again and again, the finished bottle output to the warehouse and check. |
Number of Filling Valves | 8,10,16,24,32 |
Filling Speed: | 1,000-4,000BPH (5L) |
Type of Bottles | 3L-10L bottles |
Applicable Bottle | PET Bottle, ≤200mm, Height ≤ 340mm |
Applicable Cap | Standard Screw Cap |
Filling Temperature | ambient temperature |
Filling Principle | Gravity Filling |
Filling Product | mineral water, purified water, drinking water |